The Lighting Replacement Checklist I Wish Someone Gave Me Before I Ordered

2026-10-23 · Linh Tran

Decorative lighting article feature

Before you order any replacement lighting, verify three things: actual wattage draw, control compatibility, and mounting hardware.

That's the whole checklist. Everything else is details. I learned this after a March 2024 order that cost us $1,200 in restocking fees and pushed our install back two weeks. The fixtures were fine—the assumptions were wrong.

Here's what happened, and what I do differently now, whether it's a chandelier replacement in the lobby or a light grow setup for the new plant wall.

Why my take is worth two minutes of your time

I manage procurement for a 120-person company. Roughly $400k in annual spend across 15-20 vendors. I took over in 2020 after the previous admin retired, and since then I've handled three office reconfigurations—including a full lighting swap in the 2023 renovation and a smaller indoor plant zone buildout last fall.

I'm not a lighting designer. I'm the person who makes the numbers work and explains to finance why the invoice doesn't match the PO. So when I say "verify the spec sheet against reality," I mean it from experience.

1. Wattage: '1000W equivalent' doesn't mean what you think

When I ordered the Mars Hydro TS 1000 for our plant wall, I almost made the same mistake twice. The name says '1000,' so I assumed 1000W draw. It's actually around 150W actual draw—the '1000' is a naming label for 'replaces a 1000W HPS.' That's a 6x difference in what you're plugging into the circuit and what you're paying for electricity.

I caught it during spec review (thankfully), but a colleague on another floor didn't. They ordered four units expecting 4000W total draw, then had to rework the circuit plan when the actual number came in under 700W. To be fair, the naming convention is confusing. But if you're managing a facilities budget, 'approximately 150W actual draw' is the number that matters, not the model number.

Also useful: run the fixture's actual draw against your existing breaker capacity before you order. Our plant zone shares a 20A circuit—four TS 1000 units at ~150W each is fine (about 5A total at 120V), but I've seen installs where people stack 8-10 units on one circuit without checking. That's how you get tripped breakers and a call from the fire marshal.

2. Controller compatibility: check before you install, not after

The IConnect smart controller is the piece I almost forgot. Our board wanted to schedule and dim the plant lights from a phone—no more crawling behind the wall to hit a timer. Fine. But the Mars Hydro IConnect smart controller manual isn't exactly casual reading, and I spent a full afternoon figuring out the setup sequence.

Bottom line: it needs a 2.4GHz Wi-Fi connection (5GHz won't work—learned that the hard way), and the app wants you to add devices one at a time, not in batch. The manual covers the setup order but doesn't emphasize the router band requirement prominently. If you've got a mesh network that auto-switches bands, you'll want to create a dedicated 2.4GHz SSID or you'll be troubleshooting for an hour like I was.

One thing the controller genuinely does better than I expected: scheduling. We run the plant zone lights on a 14-on / 10-off cycle, and the app lets me adjust it without standing in the room. For a large office green wall—or a small commercial grow—that's worth the setup friction.

3. Mounting and hardware: the part nobody warns you about

Chandelier replacement

Our lobby had a 40-pound brass chandelier from the original 1998 build. Replacing it meant three things the spec sheet didn't mention:

  • The junction box was rated for 50 pounds—fine—but the existing canopy was a non-standard size, so we needed an adapter plate.
  • The old chandelier hung from a swivel mount; the replacement used a rigid mount. That's a 2-hour install difference, minimum.
  • Everyone forgot the ceiling had asbestos-era insulation above it. That added a hazmat check. Budget an extra $200-300 if your building is older than 1990.

The actual chandelier replacement took four hours, not the one hour I'd estimated. The electrician was professional about it, but I was the one eating the overtime on a Friday afternoon. Note to self: always ask the building manager about ceiling conditions before scheduling the crew.

How to update track lighting without breaking the system

Track lighting was a different challenge. Our conference rooms had a Halo-style track installed in 2016. Good news: track heads are mostly standardized across Halo and Juno lines. Bad news: adapters don't always cross over, and voltage limits vary by run.

Here's the process we actually used:

  1. Identify the track type—look for the brand stamp on the track itself, not the heads. Ours said 'Halo H-Type' on the underside of the channel.
  2. Check the voltage rating—most commercial track is 120V, but some older runs are 277V. Ours was 120V, so standard LED heads worked fine.
  3. Count the load per run—the track is rated for a maximum amperage, and LED heads draw far less than old halogen units. We replaced 12 x 50W halogens (600W total) with 12 x 9W LEDs (108W), which meant the existing wiring could carry more heads later—useful for future expansion.
  4. Test one head before ordering the batch—this saved us from a bulk mistake when the first adapter didn't quite fit the old Halo track. One phone call to the vendor later, we had the right adapters shipped.

Total time for the track update: about 6 hours across 3 rooms. Not bad, considering I'd budgeted two days.

The plant zone: where light grow applications fit in

The grow light part was the newest for me. Marketing wanted a green wall in the new break area—some kind of curated plant display. Here's where I admit I didn't know what I was doing at first: a light grow setup isn't like replacing a bathroom fixture. Plants have specific light requirements, measured in PPFD (photosynthetic photon flux density), and a fixture that 'looks bright' may not deliver useful light at all.

The Mars Hydro TS 1000 turned out to be a reasonable fit for our 4x4 foot plant zone. Its full-spectrum output covers the PAR range plants need, and the daisy-chain design let me run three units off one outlet. Would I recommend it for a commercial cannabis operation? I'm not qualified to say—and the manufacturer doesn't market it that way either. For a modest green wall and a few potted plants, it's been fine.

Dodged a bullet during checkout, too—the sales rep tried to upsell us to the larger FC series, which would've been overkill for a 4x4 footprint and roughly $300 more. Sticking with the TS 1000 was the right call for our scale.

I do wish the documentation for the IConnect controller was clearer about device pairing order. Small gripe. The hardware has held up for eight months now, and finance hasn't complained about the power bill (the LED draw works out to roughly $12/month for the three units at our rates).

When this checklist doesn't apply

If you're specifying lighting in a brand-new build with a fresh electrical plan, half of this is irrelevant—your contractor will handle the circuit math. If your building is under 10 years old, mounting hardware is probably standardized already. And if you're running commercial agriculture at scale, talk to a lighting engineer, not an office admin who just learned what a PPFD chart is.

This was accurate as of early 2025. Product specs and building codes change—verify the current wattage and installation requirements before you order anything. Prices move fast in particular; my $1,200 mistake could be someone else's $800 mistake today, or worse.

One last note: if you're in a unionized building or a historic district, check the installation rules first. Our lobby chandelier replacement required a permit, which I didn't know until the electrician showed up. That added a week. Not the electrician's fault—mine. (Mental note: I really should put together a permit checklist before the next renovation.)

Linh Tran
Linh Tran

Linh Tran is an LED driver and smart-lighting controls analyst specializing in dimming, sensors, switches, wireless control, and connected lighting systems. She checks IEC 61347 controlgear safety boundaries and IEC 62386 protocol functions, then measures power factor, THD, inrush current, standby load, dimming range, addressability, and diagnostic behavior. She writes engineering guides for teams comparing drivers, motion sensors, smart bulbs, and control strategies across new installations and interoperability-sensitive retrofits.